三、阅读理解
第一节 请认真阅读下列短文,从短文后各题所给的A、B、C、D四个选项中,选出最佳选项。
A
Nantong’s Traffic Plan:
Building a Modern
Network by 2030
Connecting Rivers, Rails, and Ports
for Better Transport
On the morning of 6 March 2026, Nantong held a meeting. The city wanted to look back at its transport development and make new plans for the future. It has finished the “14th Five-Year Plan” (2021–2025) and is starting the “15th Five-Year Plan” (2026–2030).
Achievements in 2025 and the past five years
In 2025, Nantong grew fast in many ways. Big bridge and tunnel projects across the Yangtze River went well. Workers finished the main tower of the Zhangjinggao Yangtze River Bridge. The Haitai Yangtze River Tunnel was about one-third done, and the Chongqi Road-Rail Bridge was almost completed. High-speed railways were built faster. A new railway station in Qidong was opened to the public. Water transport got much better. Transport by train and ship went up by 10%, and river transport rose by nearly 25%. Nantong Port worked closely with Shanghai’s Yangshan Port.
In the past five years, Nantong has spent 121 billion yuan on transport, 1.6 times as much as in the previous five-year period. Now Nantong has become an important national transport centre.

In short, Nantong is becoming an important transport centre that connects the city more closely with the world.
(
A. The Haitai Tunnel was fully dug.
B. River transport went down by 25%.
C. The Zhangjinggao Bridge was completed.
D. The new train station in Qidong opened.
(
A. All the cross-river projects will be finished in 2026.
B. Nantong has achieved a lot in transport these years.
C. Nantong will spend 22.4 billion yuan on transport in the next five years.
D. By 2030, 75% of the trips inside the city will be made by car in Nantong.
(
A. A travel guide.
B. A fashion magazine.
C. A science magazine.
D. A local newspaper.
第一节 请认真阅读下列短文,从短文后各题所给的A、B、C、D四个选项中,选出最佳选项。
A
Nantong’s Traffic Plan:
Building a Modern
Network by 2030
Connecting Rivers, Rails, and Ports
for Better Transport
On the morning of 6 March 2026, Nantong held a meeting. The city wanted to look back at its transport development and make new plans for the future. It has finished the “14th Five-Year Plan” (2021–2025) and is starting the “15th Five-Year Plan” (2026–2030).
Achievements in 2025 and the past five years
In 2025, Nantong grew fast in many ways. Big bridge and tunnel projects across the Yangtze River went well. Workers finished the main tower of the Zhangjinggao Yangtze River Bridge. The Haitai Yangtze River Tunnel was about one-third done, and the Chongqi Road-Rail Bridge was almost completed. High-speed railways were built faster. A new railway station in Qidong was opened to the public. Water transport got much better. Transport by train and ship went up by 10%, and river transport rose by nearly 25%. Nantong Port worked closely with Shanghai’s Yangshan Port.
In the past five years, Nantong has spent 121 billion yuan on transport, 1.6 times as much as in the previous five-year period. Now Nantong has become an important national transport centre.
In short, Nantong is becoming an important transport centre that connects the city more closely with the world.
(
D
) 21. Which of the following is a success in 2025?A. The Haitai Tunnel was fully dug.
B. River transport went down by 25%.
C. The Zhangjinggao Bridge was completed.
D. The new train station in Qidong opened.
(
B
) 22. What can we learn from the passage?A. All the cross-river projects will be finished in 2026.
B. Nantong has achieved a lot in transport these years.
C. Nantong will spend 22.4 billion yuan on transport in the next five years.
D. By 2030, 75% of the trips inside the city will be made by car in Nantong.
(
D
) 23. Where might this passage come from?A. A travel guide.
B. A fashion magazine.
C. A science magazine.
D. A local newspaper.
答案
21. D
22. B
23. D
22. B
23. D
解析
【分析】本题为南通交通主题的阅读理解题,需通过定位原文对应信息解答各题:细节题需精准查找2025年成就等具体内容,推理题需结合全文判断选项正误,逐一排除错误选项得出答案。
【解析】
21题:定位原文“2025年成就”部分,原文明确提到“A new railway station in Qidong was opened to the public”,对应选项D。A选项Haitai隧道仅完成三分之一,并非全部完工;B选项河运是上升近25%而非下降;C选项张靖皋大桥仅完成主塔,未整体完工,故排除A、B、C,选D。
22题:分析选项:A选项2026年仅推进部分跨江项目完成,并非全部,错误;B选项原文详细介绍了2025年及过去五年的交通成果,说明南通在交通领域收获颇丰,正确;C选项22.4亿元是2026年的项目支出,非五年总支出,错误;D选项75%是绿色出行方式(公交、骑行、步行),并非汽车出行,错误,故选B。
23题:本文介绍南通本地交通规划与发展成就,属于本地新闻类内容,最可能来源于本地报纸,故选D。
【答案】21.D 22.B 23.D
【知识点】阅读理解,细节理解,推理判断
【点评】本题围绕南通交通发展展开,考查学生细节查找与推理判断能力,贴近生活实际,难度适中。
【难度系数】0.6
【解析】
21题:定位原文“2025年成就”部分,原文明确提到“A new railway station in Qidong was opened to the public”,对应选项D。A选项Haitai隧道仅完成三分之一,并非全部完工;B选项河运是上升近25%而非下降;C选项张靖皋大桥仅完成主塔,未整体完工,故排除A、B、C,选D。
22题:分析选项:A选项2026年仅推进部分跨江项目完成,并非全部,错误;B选项原文详细介绍了2025年及过去五年的交通成果,说明南通在交通领域收获颇丰,正确;C选项22.4亿元是2026年的项目支出,非五年总支出,错误;D选项75%是绿色出行方式(公交、骑行、步行),并非汽车出行,错误,故选B。
23题:本文介绍南通本地交通规划与发展成就,属于本地新闻类内容,最可能来源于本地报纸,故选D。
【答案】21.D 22.B 23.D
【知识点】阅读理解,细节理解,推理判断
【点评】本题围绕南通交通发展展开,考查学生细节查找与推理判断能力,贴近生活实际,难度适中。
【难度系数】0.6
登录