四、阅读理解
Taihu Tunnel, 10.79 kilometres long and 43.6 metres wide, has been the longest underwater tunnel in China. It stands out as one of the "2022 China's Top 100 Buildings in the New Era".

When building Taihu Tunnel, the project team faced many challenges, such as high safety risks and time limit. To deal with them, they made workable plans. They divided the tunnel construction (建造) into 19 parts. The construction of each part mainly took four steps.
Step 1 Remove. The team built a *cofferdam* to remove water from the area, so the workers could go inside and do their work in dry conditions.
Step 2 Clear. The team dug deep into the lake bed, and cleared the soil and stones out in order to make space for the next step.
Step 3 Build. The team built the floor, walls and roof of the tunnel in this step. They used high-quality building materials to waterproof the tunnel.
Step 4 Backfill. The team put the soil and stones back. Then this part of the tunnel was buried deep down the lake bed.
The construction of the 19 parts was streamlined(流线型的). The project team used a new method. The work group of each step moved to the next part and repeated their work after they finished the work in the previous part. Different work groups co-operated well with each other. From part to part, the construction started from the opposite ends, and got connected somewhere in the middle. The construction took about four years to complete, shorter than people had expected.
The drivers' safety is fully considered in Taihu Tunnel. There are 200,000 LED lights on the ceiling of the tunnel. They show vivid pictures of blue sky, starry night and so on. The pictures can help drivers fight tiredness and travel through the tunnel safely. Besides, there are two systems in the tunnel. The police can check the traffic situation through a monitoring system. If traffic accidents happen, the police can give instructions and warn drivers in the tunnel over an audio system to prevent further accidents.
The construction of Taihu Tunnel shows great value in engineering and the tunnel brings much convenience to people living nearby.
(

(
A. was divided into four parts
B. started from the middle of the lake
C. took more time than people had expected
D. was completed by using a streamlined method
(
A. Pictures in the tunnel can help keep drivers safe.
B. Drivers can control the LED lights in the tunnel.
C. The police can warn drivers through a monitoring system.
D. An audio system can help drivers check the traffic situation.
(
A. To advise people to protect Taihu Tunnel.
B. To introduce the construction of Taihu Tunnel.
C. To share the advantages brought by Taihu Tunnel.
D. To tell the difficulties of constructing Taihu Tunnel.
Taihu Tunnel, 10.79 kilometres long and 43.6 metres wide, has been the longest underwater tunnel in China. It stands out as one of the "2022 China's Top 100 Buildings in the New Era".
When building Taihu Tunnel, the project team faced many challenges, such as high safety risks and time limit. To deal with them, they made workable plans. They divided the tunnel construction (建造) into 19 parts. The construction of each part mainly took four steps.
Step 1 Remove. The team built a *cofferdam* to remove water from the area, so the workers could go inside and do their work in dry conditions.
Step 2 Clear. The team dug deep into the lake bed, and cleared the soil and stones out in order to make space for the next step.
Step 3 Build. The team built the floor, walls and roof of the tunnel in this step. They used high-quality building materials to waterproof the tunnel.
Step 4 Backfill. The team put the soil and stones back. Then this part of the tunnel was buried deep down the lake bed.
The construction of the 19 parts was streamlined(流线型的). The project team used a new method. The work group of each step moved to the next part and repeated their work after they finished the work in the previous part. Different work groups co-operated well with each other. From part to part, the construction started from the opposite ends, and got connected somewhere in the middle. The construction took about four years to complete, shorter than people had expected.
The drivers' safety is fully considered in Taihu Tunnel. There are 200,000 LED lights on the ceiling of the tunnel. They show vivid pictures of blue sky, starry night and so on. The pictures can help drivers fight tiredness and travel through the tunnel safely. Besides, there are two systems in the tunnel. The police can check the traffic situation through a monitoring system. If traffic accidents happen, the police can give instructions and warn drivers in the tunnel over an audio system to prevent further accidents.
The construction of Taihu Tunnel shows great value in engineering and the tunnel brings much convenience to people living nearby.
(
D
)1. Which picture shows how a "cofferdam" works?(
D
)2. The construction of Taihu Tunnel ____.A. was divided into four parts
B. started from the middle of the lake
C. took more time than people had expected
D. was completed by using a streamlined method
(
A
)3. What can we learn from Paragraph 8?A. Pictures in the tunnel can help keep drivers safe.
B. Drivers can control the LED lights in the tunnel.
C. The police can warn drivers through a monitoring system.
D. An audio system can help drivers check the traffic situation.
(
B
)4. What is the main purpose of the passage?A. To advise people to protect Taihu Tunnel.
B. To introduce the construction of Taihu Tunnel.
C. To share the advantages brought by Taihu Tunnel.
D. To tell the difficulties of constructing Taihu Tunnel.
答案
1. D
2. D
3. A
4. B
2. D
3. A
4. B
解析
翻译:
### 四、阅读理解
太湖隧道长10.79千米,宽43.6米,是中国最长的水下隧道。它作为“2022年中国新时代百项建筑”之一而备受瞩目。
在建造太湖隧道时,项目团队面临着诸多挑战,比如高安全风险和工期限制。为了解决这些问题,他们制定了切实可行的计划。他们将隧道建造工作分为19个部分。每个部分的建造主要分为四个步骤。
**步骤1:排水**。团队建造了一个**围堰**来排出该区域的水,这样工人们就可以进入(施工区域)并在干燥的环境中工作。
**步骤2:清理**。团队深挖湖床,将泥土和石头清理出去,以便为下一步腾出空间。
**步骤3:建造**。在这一步中,团队建造隧道的底板、墙壁和顶板。他们使用高质量的建筑材料对隧道进行防水处理。
**步骤4:回填**。团队把泥土和石头填回去。然后,隧道的这一部分就被深埋在湖床之下。
这19个部分的建造工作是按流程进行的。项目团队采用了一种新方法。每个步骤的工作组在完成上一部分的工作后,会转移到下一个部分并重复他们的工作。不同的工作组相互配合得很好。从一个部分到另一个部分,施工从两端的相反方向开始,然后在中间的某个地方连接起来。施工大约用了四年时间完成,比人们预期的要短。
太湖隧道充分考虑了司机的安全。隧道的天花板上有20万个LED灯。它们展示出蓝天、星空之夜等生动的画面。这些画面可以帮助司机缓解疲劳,安全地穿过隧道。此外,隧道内有两个系统。警方可以通过监控系统查看交通状况。如果发生交通事故,警方可以通过音频系统在隧道内给司机下达指令并发出警告,以防止进一步的事故发生。
太湖隧道的建造在工程方面展现出巨大的价值,并且该隧道为附近的居民带来了诸多便利。
1. 哪张图片展示了“围堰”的工作原理?
2. 太湖隧道的建造____。
A. 被分为四个部分
B. 从湖的中间开始
C. 比人们预期的花费了更多时间
D. 通过一种按流程的方法完成
3. 从第8段我们可以了解到什么?
A. 隧道内的画面可以帮助保障司机的安全。
B. 司机可以控制隧道内的LED灯。
C. 警方可以通过监控系统警告司机。
D. 音频系统可以帮助司机查看交通状况。
4. 这篇文章的主要目的是什么?
A. 建议人们保护太湖隧道。
B. 介绍太湖隧道的建造情况。
C. 分享太湖隧道带来的优势。
D. 讲述建造太湖隧道的困难。
### 四、阅读理解
太湖隧道长10.79千米,宽43.6米,是中国最长的水下隧道。它作为“2022年中国新时代百项建筑”之一而备受瞩目。
在建造太湖隧道时,项目团队面临着诸多挑战,比如高安全风险和工期限制。为了解决这些问题,他们制定了切实可行的计划。他们将隧道建造工作分为19个部分。每个部分的建造主要分为四个步骤。
**步骤1:排水**。团队建造了一个**围堰**来排出该区域的水,这样工人们就可以进入(施工区域)并在干燥的环境中工作。
**步骤2:清理**。团队深挖湖床,将泥土和石头清理出去,以便为下一步腾出空间。
**步骤3:建造**。在这一步中,团队建造隧道的底板、墙壁和顶板。他们使用高质量的建筑材料对隧道进行防水处理。
**步骤4:回填**。团队把泥土和石头填回去。然后,隧道的这一部分就被深埋在湖床之下。
这19个部分的建造工作是按流程进行的。项目团队采用了一种新方法。每个步骤的工作组在完成上一部分的工作后,会转移到下一个部分并重复他们的工作。不同的工作组相互配合得很好。从一个部分到另一个部分,施工从两端的相反方向开始,然后在中间的某个地方连接起来。施工大约用了四年时间完成,比人们预期的要短。
太湖隧道充分考虑了司机的安全。隧道的天花板上有20万个LED灯。它们展示出蓝天、星空之夜等生动的画面。这些画面可以帮助司机缓解疲劳,安全地穿过隧道。此外,隧道内有两个系统。警方可以通过监控系统查看交通状况。如果发生交通事故,警方可以通过音频系统在隧道内给司机下达指令并发出警告,以防止进一步的事故发生。
太湖隧道的建造在工程方面展现出巨大的价值,并且该隧道为附近的居民带来了诸多便利。
1. 哪张图片展示了“围堰”的工作原理?
2. 太湖隧道的建造____。
A. 被分为四个部分
B. 从湖的中间开始
C. 比人们预期的花费了更多时间
D. 通过一种按流程的方法完成
3. 从第8段我们可以了解到什么?
A. 隧道内的画面可以帮助保障司机的安全。
B. 司机可以控制隧道内的LED灯。
C. 警方可以通过监控系统警告司机。
D. 音频系统可以帮助司机查看交通状况。
4. 这篇文章的主要目的是什么?
A. 建议人们保护太湖隧道。
B. 介绍太湖隧道的建造情况。
C. 分享太湖隧道带来的优势。
D. 讲述建造太湖隧道的困难。